Corridor G Signal Upgrade Project Bid Letting
18/08/2025

The West Virginia Division of Highways (WVDOH) opened bids this week for a project to upgrade traffic signals at ten intersections along U.S. Route 119 (Corridor G).
The bid letting took place on Tuesday, August 12, 2025.
Intersections included in the upgrade:
- US 119 at US 52
- Southbound ramp at WV 73 and Fountain Place Mall
- Airport Road
- Danville
- WV 85
- WV 3 South
- WV 214 Connector
- Little Coal River Road
The Corridor G package was part of a larger letting that included twelve projects statewide, covering paving, bridge work, wall stabilization, and roadway overlays.
Bids will be reviewed and awards announced by WVDOH following evaluation.